Tiny House and ADU Services Provided by ContractorDave

Congratulations on reaching a significant milestone in your Manufactured Home, Tiny Home or

ADU project. This guide will be your comprehensive resource for effectively navigating the

installation process

PHASE I

Property Research and Municipal Code Check

Feasibility Study and Site Walk Report:

• Step 1- Comprehensive Property Research (CPR)

• Preliminary land use research CPR report - sent to you

• Step 2- Site Walk (Boots on the Ground)

• In-depth research report (Deep Dive) specifically composed for your parcel and municipality

codes - sent to you

• Once the CPR and site walk reports are complete, we will schedule a call to discuss the report

and the next steps in the process

Estimate for Installation of Your Home on the Foundation System:

(PowerFrame Foundation System)

• We will provide you with a written estimate for the set-up of your home which includes

installation of the foundation system and precise leveling

• We will explain the assumptions and limitations of the estimate

PHASE II

Commencement of Home Delivery and Installation

The initiation of the delivery and installation process of your home involves a structured sequence of

steps to ensure a seamless experience. This coordinated effort begins by collaborating with your

chosen builder or factory to guarantee that the selected home is constructed precisely according to

your specifications, meeting the required standards for a successful delivery.

Simultaneously, we assure that your contractor has meticulously prepared your site, ensuring that it is

adequately primed to receive the home on the scheduled delivery day. This entails working closely

with your contractors and the transport company to ensure a seamless and well-facilitated process

before the arrival of our construction department.

The scheduling of the home installation commences with the coordination of dates that are suitable

for both you and your contractors. A carefully planned arrival date for our dedicated work crews is

established, marking the outset of the home installation process.Write your text here...

This comprehensive approach ensures a methodical and organized commencement to the delivery and

installation of your home, ultimately leading to a successful and well-prepared housing solution.

PHASE III

The Tiny House Installation Process

Setting and leveling the home on its foundation:

• Providing the labor and materials for installing the home on its foundation

• Installing additional perimeter piering as per the set-up manual.

• Precisely leveling the home using the water level method.

• Inspection services, on site with local jurisdiction inspector to ensure passing

Project Management Option:

Above is the basic Order of Service program that we offer. We assume you are handling the

rest of the project yourself which includes procuring the engineering and permits for your

project as well as contracting directly with local contractors and managing the remainder of

the project. There are many other aspects of the project and we’re here to help if needed, so

if you opt out of managing the full construction process, our project management services will

handle everything for you.